power plantzugang in herbstlichem Lärchenwald – Betonportal am Berghang aus Drohnenperspektive

Saas-Grund

Saas-Grund harnesses the energy potential of two drinking-water lines: two Pelton turbines installed in a rock cavern operate at heads of 543 m and 386 m, delivering a combined output of 558 kW.

Trinkwasserkraftwerk Saas-Grund AG
Location
Saas-Grund (VS), Switzerland
Year of manufacture
2021
Turbine type

2 horizontal Pelton turbines with 2 nozzles each

Total power

558 kW

In Fels eingelassener Betoneingang zum power plantgebäude mit Natursteinmauer in herbstlichem Lärchenwald

For Saas-Grund, TROYER supplied the electromechanical equipment and control system, fully suitable for drinking-water applications, with stainless-steel construction and exclusively electric actuators, as well as the connection to the existing drinking-water control system.

Unit
Rated flow
Head
Turbine power
Generator

Pelton - horizontal - 2 nozzles - drinking water

90 l/s

543.00 m

430 kW

Synchronous generator
505 kVA, 400 V
1,500 rpm
Open cooling circuit

Pelton - horizontal - 2 nozzles - drinking water

45 l/s

385.50 m

153 kW

Synchronous generator
230 kVA, 400 V
1,500 rpm
Open cooling circuit