Übersicht der machine hall mit turbine, red generator und yellow hydraulic power unit

Findelnbach

At the foot of the Matterhorn, Findelnbach harnesses a head of 509 m. One vertical Pelton turbine with four nozzles delivers around 4.4 MW.

Elektrizitätswerk Zermatt AG
Location
Zermatt (VS), Switzerland
Year of manufacture
2017
Turbine type

1 vertical Pelton turbine with 4 nozzles

Total power

4,370 kW

power plant Findelnbach Zentrale Wiesti in Zermatt mit Brücke über Gebirgsbach und Skifahrer vor Alpenpanorama

After cracks developed in the existing turbine shaft, TROYER replaced the complete electromechanical equipment at Findelnbach. With the same water flow, the new unit delivers around one-third more power.

Unit
Rated flow
Head
Turbine power
Generator

Pelton - vertical - 4 nozzles

1,000 l/s

509.00 m

4,500 kW

Synchronous generator
4,900 kVA, 6,300 V
1,000 rpm
Closed cooling circuit