machine hall mit zwei Francis turbinensätzen – blue spiral casing, red generators und TROYER-Schild mit Hallenkran

Grigno

Deep underground in the Valsugana lies the Grigno hydropower plant. Two horizontal Pelton turbines harness a head of 480 m and deliver a combined output of 14.5 MW.

Hydro Dolomiti Enel Srl
Location
Grigno (TN), Italy
Year of manufacture
2012
Turbine type

2 horizontal Pelton turbines with 2 nozzles each

Total power

14,474 kW

Historical power plantgebäude Centrale Sul Grigno mit Marmorverkleidung vor steiler Felswand

After 66 years of operation, TROYER modernized the Grigno cavern power plant with two new generating units and a digital control system replacing the old relay-based technology. The result: around 10% more power.

Unit
Rated flow
Head
Turbine power
Generator
Transformer

Pelton - horizontal - 2 nozzles

1,750 l/s

480.00 m

7,402 kW

Synchronous generator
9,000 kVA, 5,000 V
750 rpm
Closed cooling circuit

8,000 kVA
66,400 V / 5,000 V

Pelton - horizontal - 2 nozzles

1,750 l/s

480.00 m

7,402 kW

Synchronous generator
9,000 kVA, 5,000 V
750 rpm
Closed cooling circuit

8,000 kVA
66,400 V / 5,000 V