Super Chepe harnesses a head of 540 m in the Nepalese Himalayas. Two horizontal Pelton turbines deliver a combined output of around 9 MW.

Super Chepe
Ridge Line Energy Pvt. Ltd.
Location
Ajirkot Rural Municipality (Gorkha), Nepal
Year of manufacture
2022
Turbine type
2 horizontal Pelton turbines with 2 nozzles each
Total power
8,866 kW


