Rasimbach

Rasimbach in the Passiria Valley was created by combining two existing hydropower plants. Two horizontal Pelton turbines harness a head of 445 m and deliver a combined output of around 4.4 MW.

ESTL Konsortial GmbH
Location
San Leonardo i. P. (BZ), Italy
Year of manufacture
2011
Turbine type

2 horizontal Pelton turbines with 2 nozzles each

Total power

4,439 kW

Unterirdisches power plantgebäude mit begrüntem Dach und Betoneingang in green Südtiroler Almlandschaft am Bach

For Rasimbach, TROYER supplied the electromechanical equipment, including the control system and switchgear. The hydropower plant combines two former plants and is located entirely underground.

Unit
Rated flow
Head
Turbine power
Generator
Transformer

Pelton - horizontal - 2 nozzles

575 l/s

445.05 m

2,279 kW

Synchronous generator
3,000 kVA, 6,300 V
1,000 rpm
Closed cooling circuit

3,000 kVA
21,000 V / 6,300 V

Pelton - horizontal - 2 nozzles

575 l/s

445.05 m

2,279 kW

Synchronous generator
3,000 kVA, 6,300 V
1,000 rpm
Closed cooling circuit

3,000 kVA
21,000 V / 6,300 V