Project
Power plant Super Chepe
Scope of delivery: delivery, assembly and commissioning of the electromechnical equipment for the hydropower plant.
Customer | Ridge Line Energy Pvt. Ltd. |
Turbine type | Two 2-nozzle Pelton turbines |
Total capacity (PEL) | 9.048 kW |
Set 1 Power (PT) | 4.524 kW – Flow rate (Qmax): 1000 l/s – Head: 539,75 m |
Set 2 Power (PT) | 4.524 kW – Flow rate (Qmax): 1000 l/s – Head: 539,75 m |