PROJEKT
ANLAGE OBERE LORZE
Scope of delivery: delivery, assembly and comissioning of the electromechanical equipment for the hydropower plant.
| Customer | WWZ Energie AG – Baar (ZG), CH |
| Turbine type | two Francis turbines |
| Total capacity (PEL) | 1980 kW |
| Set 1 Power (PT) | 1264 kW – Flow rate (Qmax): 2000 l/s – Head: 75,40 m |
| Set 2 Power (PT) | 716 kW – Flow rate (Qmax): 1100 l/s – Head: 77,70 m |