Project
Power plant Kelchsau Zwiesel
Scope of delivery: delivery, assembly and commissioning of the electromechnical equipment for the hydropower plant.
Customer | Stadtwerke Wörgl GmbH |
Turbine type | Two 4-nozzle Pelton turbines – 1 Kaplan turbine |
Total capacity (PEL) | 5.011 kW |
Set 1 Power (PT) | 2.446 kW – Flow rate (Qmax): 1400 l/s – Head: 208,39 m |
Set 2 Power (PT) | 2.446 kW – Flow rate (Qmax): 1400 l/s – Head: 208,39 m |
Set 3 Power (PT) | 119 kW – Flow rate (Qmax): 2500 l/s – Head: 5,70 m |