Our automation systems are designed in such a way that the plant’s water resources are automatically used in the most efficient way possible. The power plant automatically adapts to different operating conditions and is operated with maximum efficiency at all times. The control of the power plant is carried out entirely by the PLC and is independent of the SCADA system, which is installed on one or more PCs in the power plant. This ranking guarantees full functionality of the automation system, even in the event of a PC failure.
Control design
The automation system is designed in such a way that all stable and transient operating conditions, such as parallel operation, network disconnection, plant protection, plant isolated operation and reconnection to the network, are automatically guaranteed at any time.