Baden (AG), Switzerland

One of the highest-capacity power plants in Switzerland began operation in 2014. The electromechanical equipment, control and automation systems were all made by Troyer. A major challenge was to transport components along the steep and narrow access road. The plant features internally regulated nozzles (the Troyer standard for large turbines) while nozzle inserts and jet deflectors are individually removable, thus simplifying replacement.

Customerpower plant run by Tasnan AG, Baden (AG), Switzerland
Turbine typeone 6-nozzle Pelton turbine
Total capacity (PEL)6245 kW
Set 1power (PT): 6620 kWflow rate (Qmax): 2500 l/shead: 298 m